The project aims to create independent cabins for the computer systems and servers.
By providing a separate control room that’s equipped with special air conditioning, a separate door connected to a separate electrical panel from the building electric.
To ensure the electrical continuity in case the main electricity in the building went down due to a technical malfunction.
In addition to the custom air conditioning and isolating vacuum for the cabins, all of that led to maximize the performance and minimize the fault and maintenance.